Lane & transit
Pick a seeded corridor, then override any value.
Linehaul & cargo
Linehaul rates and the cargo balance sheet behind the load.
Unadjusted for drayage, chassis or holding cost — this is the number that flatters rail.
Drayage & chassis
Layer 1 — origin and destination dray legs plus chassis dwell.
7.0d total (5.0d rail transit + 2.0d free/turn dwell @ $35.00/day)
Domestic 53ft workflow hides maritime fees. Enable to model port accessorials on a domestic move, or switch to Port IPI mode.
Dated fuel snapshot
Layer 2 — index selection and quote-date lock.
| Nov 9, 2026 | $4.03 | +$0.43 |
| Nov 2, 2026 | $4.00 | +$0.40 |
| Oct 26, 2026 | $3.97 | +$0.37 |
| Oct 19, 2026 | $3.95 | +$0.35 |
Rail shows a paper discount of $526.30, but landed cost creates $937.85 margin leakage
Drayage, chassis and inventory drag consume the paper linehaul advantage.
ETG Tuesday clears inside the 2-day free window (LFD Thursday) — no LFD storage projected.
Cost stack waterfall
landed comparisonBars share one scale. Remaining track is the landed cost gap between the two modes.
Phantom discount
Rail costs more than truckload once the full door-to-door stack is loaded.
47% of total rail friction relies on unverified spot/dwell assumptions · 3 of 8 inputs tagged EST.